|
Plumbing and Heating
The latest climate control air-conditioning has been
used in all areas except the bathrooms where under
floor heating is standard. Hot water is delivered via
an unvented hot water cylinder.
Windows
We have tried to ensure the buildings character is
maintained, hardwood energy efficient double
glazed windows in the original design have been
installed in all stone buildings whilst white uPVC
versions have been used for all rendered properties. |
Insulation
High grade energy saving insulation has been used
as has acoustic sound proofing between apartments.
Rainwater Products
Once again, original features have been reproduced
by the use of cast iron gutters and down pipes.
Joinery
Replica heritage hardwood entrance doors have been
installed and internal doors are finished in a light oak
veneer and contemporary chrome door furniture.
A walnut finish is also available at an extra cost.
|